Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13594530

- Product Categories
- Friendly Links
- home > Supply > The largest production base _ roaster Sheng Yu Machinery professional and reliable (certified) _ Roaster
The largest production base _ roaster Sheng Yu Machinery professional and reliable (certified) _ Roaster
Information Name: | The largest production base _ roaster Sheng Yu Machinery professional and reliable (certified) _ Roaster |
Published: | 2015-01-16 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | If there Simie roaster slime treatment approach that fire slime Simie boiling furnace manufacturers, mainly due to the wind down of coal or coal ratio is too large and cause, or improper operation caused a fire when raising and processing of local coking. During normal operation of professional roaster manufacturer, if found in the furnace of fire re-dark color, should be promptly stopped and blowers, Smouldering 20-30 minutes, then boil the furnace to withdraw 2-3 primer coal shovel, turn the blower, so that the whole furnace surface boil 30 to 50mm, stable 20-30 minutes will slowly re-ignition furnace. But note that coal can not withdraw more than a primer, otherwise easy to coke furnaces resurgence; blast volume can not be too large, it is best not to exceed the boiling bed 50mm, otherwise it will be blowing out the fire to boil. More technical questions please call consulting the picture. We will be happy to serve you! Boiling furnace heat stability, high efficiency, internal heat exchange tube full of boiling furnace, dryer production increased significantly. Preliminary determination: In early slag 20% ??moisture, the yield increased from the dryer 9.5t / h or so to around 14.6t / h, increase a rate of 53.6%. Slag final moisture control and stability, the water content of 1.5% or less 100% pass rate saving boiling furnace explosion, in full compliance with the quality requirements of cement production. After drying bituminous to anthracite instead consumed per ton of dry bagasse bituminous coal by the transformation of the former 70kg / t down to 50kg anthracite / t. If the annual output of slag cement 120 000 t, 36% incorporation of slag, 125 yuan per ton of anthracite, bituminous coal 165 yuan per ton basis, the annual amount required to dry slag 43 200 t, economizer only a year can save money The maximum amount of 228,960 yuan production base _ roaster Sheng Yu Machinery professional and reliable (certified) _ roaster provided by Xinxiang Yu Sheng Machinery Co., Ltd. Xinxiang City, Yu Sheng Machinery Co., Ltd. (www.xxshengyu.com) Henan Xinxiang, a leader in industrial boilers and accessories over the years, the company implementing the scientific management, innovation and development, the principle of honesty and trustworthiness, and satisfy customer needs. Sheng Yu Machinery leadership with the staff warmly welcome all inquiries negotiations to create Sheng Yu Machinery a better future. |
Admin>>>
You are the 29461 visitor
Copyright © GuangDong ICP No. 10089450, Xinxiang City, Yu Sheng Machinery Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 29461 visitor
Copyright © GuangDong ICP No. 10089450, Xinxiang City, Yu Sheng Machinery Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility