Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13594530

- Product Categories
- Friendly Links
Information Name: | Furnace slag boiling, boiling furnace, Yu Sheng Machinery |
Published: | 2014-11-03 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Furnace slag boiling, boiling furnace, Sheng Yu machinery supplied by Yu Sheng Machinery Co., Ltd. Xinxiang City. Road Zhiyuan, tempering forward. Xinxiang City, Yu Sheng Machinery Co., Ltd. (www.zgsyjx.com) strive to be and you win, symbiosis, strategic partners before the trip, the more determined to become industrial boilers and accessories of the most influential business, and you leap together to successful products:! Sheng Yu Sheng Yu boiling furnace slag drying boiling furnace slag drying at low temperature coking: Cold coke usually occurs when the ignition or compression fire, uneven air distribution is its main causes, the furnace temperature is low, there is no crater Grilled Powder can also be formed in time low coking. When operating around the bed to make homogeneous combustion furnace, with the furnace temperature rises gradually adjust the wind to see the fire, but also the more timely and stir with a rake Pa scattered mouth, controlled heating time 600-700 ℃ before, fire coal to do Qin cast, plus a small, cast loose. Low-temperature coke used in the heating process can feed rake Bachu. Sheng Yu boiling furnace slag drying temperature coking: When the temperature rises to about 1100 ℃, if not promptly take measures to lower the slag cooling, it is easy to produce high-temperature coke. During normal operation the bottom dross too thick to feed a large amount of coal or coal stove boiling security becomes high fever, or improper air fuel ratio control is also easy to produce high-temperature coke. During operation, the operator should remain at their posts, pay close attention to changes in the furnace, the furnace temperature was found, when many holes Spitfire found quickly to reduce the amount of coal fed by fierce winds blowing excess boiling layer while using excessive bottom dross let go, to measure the boiling add the right amount of cold wet slag layer and so on. Coke is not serious, shall block the door as soon as possible to eliminate coke. As a serious coke should shutdown after re-ignition furnace cleared. Xinxiang City, Yu Sheng Machinery Co., Ltd. is China's only one of the most professional roaster production enterprises, leading products: the newly developed intelligent energy-saving rice hulls dedicated roaster, vertical mill, slag, fly ash, blue carbon, coal, iron ore, lignite, sand, bentonite, calcium carbide slag and other special boiling furnace, the two have a professional qualification furnace masonry construction team. Yu Sheng Machinery staff sincerely welcomes foreign businessmen to visit our company, guidance, talk about friendship, business negotiations. We will be first-class quality, first-class service, first-class reputation with our customers long-term cooperation. Boiling furnace that is popular kind of stove, then what is the process of using boiling furnace needs? Also Ovens it, then the roaster oven What you need to know it? 1. Check the roaster layers Thermometer, oil guns, pumps, etc., used to prepare the oven; 2. ajar boiling roof vent chimney; 3. Boiling furnace shop sand about 15cm, cover the hood; 4. HRSG bottled water boiling furnace, furnace filled with boiling water so that the evaporator tubes; 5. strict accordance with the requirements of the schedule were oven ovens, boiling furnace temperature control to the upper temperature prevail; 6. when the roof temperature reaches 120 ℃, open the cyclone the sand seal ash roaster, the oven hot air is introduced into the waste heat boiler, with the roaster oven to bake and cook for waste heat boiler furnace; 7. When you can not continue to heat with wood furnace slag boiling closure inspection manhole open the furnace fan, heating oil gun; 9. When boiling furnace temperature dropped to 150 ℃; 8. natural cooling should be carried out slowly, avoid open fan forced cooling or premature opening the inspection manhole ventilation to cool the large amount of You can open manhole cover, all open air to cool the chimney cap; 10. When the oven temperature drops below 50 ℃, boiling furnace furnace cleaning; 11. boiling furnace checked each part; These are the roaster oven program, I hope we all have to look at. |
Admin>>>
You are the 29461 visitor
Copyright © GuangDong ICP No. 10089450, Xinxiang City, Yu Sheng Machinery Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 29461 visitor
Copyright © GuangDong ICP No. 10089450, Xinxiang City, Yu Sheng Machinery Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility